PPES Works (Sarawak) Sdn Bhd (209892-K)

ppes_projecst_SSRS1

Sungai Sarawak Regulation Scheme (SSRS), Kuching
Contract value: RM150.0 mil
Completion: 1998
Client: JKR Sarawak
Brief description: This award-winning project was the first of its kind (barrage and shiplock) in South-East Asia.

Kidurong Shoreline Protection at Tanjung Kidurong, Bintulu
Contract value: RM3.43 mil
Completed: 1999
Client: Malaysia LNG Sdn Bhd

ppes_project_Matang_septic_plant1

Matang Septic Sludge Treatment Plant, Kuching
Contract value: RM11.43 mil
Completed: 2000
Client: DID Sarawak
Brief description: PPES Works undertook the mechanical & electrical and process engineering components at this project – also a first in Sarawak.

ppes_project_IOT_Package1

Independent Oil Terminal at Senari, Kuching (Package 1 – Site preparation works)
Contract value: 20.76 mil
Completion: 2004
Client: ASSAR Chemicals Sdn Bhd
Brief description: PPES Works was awarded Phase 1 of the development following an open tender in July 2003 to prepare the 16.2 hectare site. As part of the larger development of an industrial complex, the IOT at Senari caters for the storage and distribution of bulk petroleum, as well as, downstream activities of the oil & gas, petrochemicals and oleo-chemicals industries.

ppes_project_IOT_Package3_1

Independent Oil Terminal at Senari, Kuching (Package 3 – Bulk Depot Facilities & Package 4 – LPG Bottling Facilities)
Contract value: RM120.0 mil
Completion: 2006
Client: ASSAR Chemicals Sdn Bhd
Brief description: Following a competitive bid exercise, a joint venture between PPES Works and Chiyoda Malaysia Sdn Bhd was awarded this RM120.0 mil contract by ASSAR Chemicals Sdn Bhd to develop Phase 3 and 4 of the IOT project adjacent to Senari Port in Kuching. The project included engineering, procurement, construction and commissioning of the bulk depot facilities and the Liquid Petroleum Gas (LPG) bottling facilities.

ppes_project_Mukah_power_plant

Mukah Coal-Fired Power Plant (Non-Plant Zone)
Contract value: 38.0 mil
Completion: 2008
Client: Sarawak Enterprise Corporation Berhad
Description: PPES Works undertakes civil works for both the plant and non-plant zones at the 2X135 MW Coal-Fired Power Station in Mukah, Sarawak. As turnkey contractor for the Non-Plant Zone, PPES Works’ scope of works comprises infrastructure works, site-clearing and earth works, the administration zone, stores, workshop, staff housing and supporting amenities.

ppes_project_Mukah_power_plant2

Mukah Coal-Fired Power Plant (Plant Zone)
Contract value: 127.0 mil
Completion: 2009
Client: Sarawak Enterprise Corporation Berhad
Description: PPES Works undertook civil works for both the plant and non-plant zones at the 2X135 MW Coal-Fired Power Station in Mukah, Sarawak. As turnkey contractor Plant Zone, PPES Works undertakes the on-shore portion of civil works – ie the main power block, flue gas system, coal handling system, and other infrastructure and water-related systems including ash pond and cooling pond.

Once operational, the Mukah Coal-Fired Power Plant will meet Sarawak’s increasing needs for adequate power demand. Using the large coal deposits found in the Mukah-Balingian area, the Mukah coal-fired power station will be the largest turbine power plant in the State, providing 15% of Sarawak’s power needs.